The Balmoral Hotel recently contracted us in to carry out the works to replace their existing spa facilities. The works included removal of their existing thermal suites, shower area and floor tiles. These were then replaced as new and included partially glazed fronts to both the sauna and steam room, along with contrasting saunaboard in the sauna and microcement in the steam room and shower areas. Feature lighting was included in the areas to create a stunning dramatic effect to the beautiful hotel.

GET IN TOUCH






UK SAUNA MANUFACTURER, INFRARED SAUNA AND STEAM ROOM SPECIALISTS - 01505 850 625

GET IN TOUCH
CALL NOW