Stobo Castle Health Spa are a long standing client of ours and earlier this year, we entered into talks about the commencement of a project to refurbish their hydro pool. The project was to include the preparation of the existing pool to make it ready to accept new tiles, the re-tiling, installation of new fixtures and fittings, replacement jet pack seats, showers and re-tiling of the existing walls. We had bespoke fittings made for the hydro pool loungers as we found the ones on the market to be of inadequate quality and functionality. Bespoke hand rails and stainless steel bars were also manufactured. Inca UK also fixed the ventilation and air handling within the room, this means that the room is at a much more comfortable bathing temperature. The project was completed on Friday evening with their newly refurbished water treatment room opening on Saturday morning.

GET IN TOUCH






UK SAUNA MANUFACTURER, INFRARED SAUNA AND STEAM ROOM SPECIALISTS - 01505 850 625

GET IN TOUCH
CALL NOW